立博

  • Shanxi 20 × five hundred
  • Purpose:

    Gas Source:

    locations:

    Capacity:

    Work Scope:

    • DESCRIPTION


      项目介绍
      1. Strengthen the safety management of explosive and non explosive areas in gas power stations. (Completed)
       
      2. The gas and water mist transmission pipeline is not insulated near the generator room. (Completed)
       
      3. The flame arrester support of the intake branch line did not reach the ground. (Completed)
       
      4. There is a significant accumulation of oil pollution under the generator unit, and effective measures should be taken to discharge it outdoors. It is strictly prohibited to exist at the bottom of the unit or in the cable trench. (Cleaned, oil stains at the bottom of the unit will be cleaned every shift)
       
      5. The drainage and exhaust of the generator set shall be treated according to regulations, which may cause outdoor pollution. (Completed, the drainage outlet has been plugged, and the drainage water is regularly discharged through pipelines)
       
      6. The surface of the pressure gauge in the branch water pipeline has a lot of oil stains, and the unit has oil leakage. (Completed)

    Service

    classification

    product

    recommendation

    Contact

    Information
    • Tel:0531-69953988
      13012995645
    • Add:101, Building 5, Liandong U Valley Science and Technology Innovation Center, Zhangjin Comprehensive Bonded Zone, No. 33688 Jingshi East Road, Suncun Street, Jinan Area, China (Shandong) Pilot Free Trade Zone

    截屏,微信识别二维码

  • 立博